Commercial EICR Guide: How Often Should Business Premises Be Tested?

How often should a commercial EICR be carried out? Understand the risk-based approach, common intervals and what happens after an unsatisfactory report.

Electrician testing a commercial distribution board in a plant room

A commercial Electrical Installation Condition Report (EICR) records the condition of a building’s fixed electrical installation and identifies damage, deterioration, defects or non-compliances that may give rise to danger. It is a key part of planned electrical maintenance—but the question “how often do we need one?” does not have one universal answer for every workplace.

This guide explains the risk-based approach for employers, landlords, facilities managers and dutyholders in Great Britain. It is general guidance; the appropriate inspection and testing programme must be determined for the installation and premises by competent people.

Is a commercial EICR a legal requirement?

The Electricity at Work Regulations 1989 require electrical systems to be maintained, so far as is reasonably practicable, to prevent danger. The regulations do not simply state that every commercial property must have an EICR at one fixed interval. However, periodic inspection and testing is a recognised way to establish condition, identify danger and provide evidence for an effective maintenance system.

The Health and Safety Executive’s Electricity at Work: Safe Working Practices (HSG85) and its workplace electrical safety guidance explain the duty to maintain systems and use competent people.

Other requirements can also arise from a lease, insurer, licensing regime, contract, fire risk assessment or sector-specific standards. Commercial landlords and tenants should be clear about who is responsible for the fixed installation and who controls any remedial action.

How often should a commercial EICR be carried out?

Five years is a common maximum interval recommended for many commercial installations, but it is not a blanket rule. The next inspection date on the previous report, the current edition of BS 7671 guidance, the designer’s information and a competent electrician’s assessment should all be considered.

Shorter intervals may be appropriate where the installation is exposed to moisture, heat, dust, vibration, corrosive conditions, heavy use, frequent alterations or a history of defects. A well-managed, low-risk office installation with good records may be treated differently from a workshop, kitchen, external installation or 24-hour industrial site.

Factors that determine the inspection interval

  • Type and age of installation: older equipment, mixed wiring systems and previous alterations can increase uncertainty.
  • Use of the premises: offices, shops, healthcare sites, warehouses and industrial premises present different conditions.
  • Environmental exposure: water, dust, heat, chemicals, outdoor use and mechanical impact can accelerate deterioration.
  • Quality of maintenance: recurring faults or incomplete records may justify more frequent inspection.
  • Change of occupancy or use: new loads, layouts or operational processes can affect the installation.
  • Previous report: the inspector should recommend the date of the next periodic inspection based on findings and condition.
  • Contractual requirements: insurers, landlords and clients may specify particular evidence or intervals.

What does a commercial EICR cover?

After agreeing the extent and any operational limitations, the inspection and testing may cover distribution boards, protective devices, earthing and bonding, circuits, accessories, isolation, signs of damage or overheating, and the effectiveness of protection against electric shock and fire.

An EICR is not automatically a 100% inspection of every concealed cable or accessory. The agreed extent, sampling, exclusions and inaccessible areas should be clearly recorded. For live facilities, planning is important so that shutdowns, sensitive equipment, tenants and critical services can be managed safely.

Understanding EICR classification codes

  • C1—Danger present: immediate action is required to remove the danger.
  • C2—Potentially dangerous: urgent remedial action is required.
  • C3—Improvement recommended: the issue is not classified as dangerous, but improvement would enhance safety.
  • FI—Further investigation required without delay: more work is needed to determine whether danger exists.

A report containing C1, C2 or FI observations will normally be assessed as unsatisfactory. The dutyholder should arrange suitable remedial work or investigation and retain evidence of completion. A C3 does not by itself make the report unsatisfactory, but it should not be ignored without consideration.

EICR versus PAT and routine maintenance

An EICR concerns the fixed electrical installation. Portable appliance testing (PAT) is one possible part of maintaining electrical equipment, but it is not a substitute for inspecting the installation. Likewise, an EICR does not replace user checks, fault reporting, thermal inspections where justified, emergency lighting tests or planned maintenance of equipment.

The strongest approach is an evidence-led maintenance plan: staff report damage, competent people repair faults, inspection frequencies reflect risk, and records are reviewed together rather than treated as disconnected certificates.

When should you arrange an EICR early?

Do not wait for the planned date if there has been flooding, fire, significant damage, repeated tripping, signs of overheating, major alterations or a material change of use. An assessment may also be prudent before acquiring a building, starting a new lease or planning increased electrical loads.

Indigo Systems provides commercial electrical services across London and the South East, including inspection, testing, planned maintenance and remedial works. We coordinate with facilities teams to manage access, safe isolation and disruption in live environments.

Frequently asked questions

Is a five-year commercial EICR compulsory?

Not as a universal rule for every commercial premises. Five years is commonly recommended for many installations, but the correct interval is risk-based and should follow the previous report, relevant guidance and competent assessment.

Can a business stay open during an EICR?

Often, but proper testing requires access and periods of safe isolation. Phasing, out-of-hours work and coordination with critical systems can reduce disruption. Any limitations must be agreed and recorded.

Who can carry out a commercial EICR?

A person competent for the complexity and type of installation, with the knowledge, experience and test equipment needed to inspect, test and interpret the results safely.

What happens after an unsatisfactory EICR?

Prioritise immediate and potential dangers, arrange remedial work and complete any further investigation. Keep the report, work records and suitable confirmation of the completed remedial work with the installation records.

Plan your commercial electrical inspection

If an inspection is due, records are incomplete or the building has changed use, contact Indigo Systems. We can review the installation, agree a practical testing scope and help turn the findings into a manageable remedial programme.

Want to see this type of work in practice?

Browse Indigo project examples across healthcare, commercial, residential and public-sector buildings.

View Projects

Leave a Comment

Your email address will not be published. Required fields are marked *